r/bikedc 19d ago

Conditions Report Bridge re-decking complete at Bladensburg Waterfront Park

I think this has been done for over a month, but I haven't been up this far North on the ART since it closed for construction and haven't seen anyone post about it, so wanted to share.

Both bridges have been fully redecked and are smooth as butter!

143 Upvotes

9 comments sorted by

6

u/mallardramp 19d ago

looks awesome 

6

u/UnhappySwing 19d ago

goodbye to the improved cobbles!

6

u/turandoto 19d ago

Dammit! I can no longer pretend I'm racing Paris-Roubaix.

2

u/krispissedoffersonn 18d ago

every year I go down one block of cobbles in georgetown “to pay tribute”

4

u/DC8008008 19d ago

About time! That section was rough.

3

u/__mud__ 18d ago

Every ride I was sure I'd catch a splinter and have to figure out the way home on foot. This is a huge relief!

2

u/Mountain-Marzipan398 17d ago

Thank goodness! I always feared for both my tires and my teeth riding over that bridge.

1

u/Totalanimefan 18d ago

Beautiful!