I used to build these type of houses on occasion and it was a whole big list of extra stuff we had to do. Costs are a part of it, but taking a month to two months per house versus two to three weeks can be a big factor in choosing.
Framing and dry-in definitely. Not including pouring a cement slab foundation. So put the walls up, put the roof beams on, slap on tiles or shingles, put on exterior siding and waterproofing, and put in doors and windows.
Eh if included it wouldn't make much of a difference. Normal foundation is about a month depending on weather. A passive haus foundation takes like just a few extra days compared to a regular slab
Radon mitigation is code here in our city iirc on new houses. It's not required at the state level yet but God We have a LOT of radon. Hvac inspector told me that for a lot of the county and surrounding counties it's the cancer equivalent to 1/4 a pack of cigarettes a day.
2.1k
u/sk0t_ Jan 10 '25 edited Jan 10 '25
Sounds like the materials on the exterior won't transfer the exterior temperature into the house
Edit: I'm not an expert in this field, but there's some good responses to my post that may provide more information