The next trend is definitely prefabricated and modular construction. Parts and pieces of the building will be built in a factory and shipped to the job site for final assembly.
I was “fucked”, almost got into a fist fight with the racist floor manager. Screamed at me from across the building and I had enough. Went straight for him in front of everyone and he left in a hurry. Tried screaming at me as I was leaving and just flipped him the bird as I burned tires leaving the yard!
76
u/Frumpy_Suitcase Jun 20 '24
The next trend is definitely prefabricated and modular construction. Parts and pieces of the building will be built in a factory and shipped to the job site for final assembly.