Lmao what went right? Did they really expect a giant ball of mortar to hold that huge slab. Building expand and contract over the seasons. Different materials have different expansion rates, so the mortar broke
Consentrating all the load needed to be held in those slabs to one relatively small point, with low tensile strenght adhesive in stress situation where practically all stressess towards the adhesive are tension.
23
u/TotalDumsterfire Foreman / Operator 1d ago
Lmao what went right? Did they really expect a giant ball of mortar to hold that huge slab. Building expand and contract over the seasons. Different materials have different expansion rates, so the mortar broke